Skip to content
  • Home
  • About
  • Services
    • Engineering
    • Procurement
    • Construction
    • Installation
    • Commissioning
    • Marine Logistics & Security
    • ManPower
    • Well Intervention
  • Projects
  • Policies
    • Health & Safety Policy
    • Security
    • Environment
    • Marine Operations
    • Nigerian Content Plan
  • Fleet
  • Home
  • About
  • Services
    • Engineering
    • Procurement
    • Construction
    • Installation
    • Commissioning
    • Marine Logistics & Security
    • ManPower
    • Well Intervention
  • Projects
  • Policies
    • Health & Safety Policy
    • Security
    • Environment
    • Marine Operations
    • Nigerian Content Plan
  • Fleet
Contact Us

what have we done

Home
>
Projects

Journey through Edemx Energy’s portfolio of achievements in the Projects’ section, where success stories come to life. Each project showcases our dedication to excellence and the impactful contributions we make to the oil and gas industry.

ONGOING

CONSTRUCTION OF 1.55KM 6 SCH 160 OBEN IMIU-01 DUAL GAS FLOWLINES

SEPLAT WEST LIMITED intends to execute a project on the Construction of 1.55KM 6 SCH 160 Oben IMIU-01 Dual Gas Flowlines. The scope includes the following:
Read more
ONGOING

CONSTRUCTION OF THE 24-INCH AMUKPE-RAPELE PIPELINE 2.5KM SECTIONAL REPLACEMENT PROJECT- PHASE 2.

SEPLAT WEST LIMITED intends to execute a project on the Construction of the 24-inch Amukpe-Rapele Pipeline 2.5km Sectional Replacement Project- Phase 2. The scope includes the following:
Read more
ONGOING

PROVISION OF QUALITY ASSURANCE, QUALITY CONTROL AND PROJECT MANAGEMENT SERVICES FOR 4 X 30,000 BBBL CRUDE OIL STORAGE TANKS OML 111

Nigerian Petroleum Development Company Limited (NPDC), a subsidiary of Nigerian National Petroleum Corporation (NNPC) intends to set up a tank farm to be located at Oredo Flow Station within OML 111 in Edo State. The system will consist of four (4) crude oil storage tanks with a capacity of 30,000 barrel per tank, making a total of 120,000-barrel crude oil storage facility. The existing facilities at Oredo flow station will pump from (3) sources (5,000 BOPD Condensate Stabilizer, EPF2 Crude Transfer Pumps and from booster pump 50-P-2402) to a common header into the 4 x 30,000bbl storage tank facility. Crude Oil from the 4 x 30,000 bbl storage facility will be discharged to the 6” header of the existing 2 x 20,000BOPD export pumps which then sends it through metering facility for export.
Read more
ONGOING

PROVISION OF HEAVY MARINE VESSELS FOR SWAMP SUPPORT (TUGS, BARGES AND HOUSEBOATS)

Chartering of tugboats, barges, and houseboats to various SPDC locations
Read more
COMPLETED

SECTIONAL REPLACEMENT ON SELECTED PORTION OF OGHAREFE – AMUKPE EXPORT PIPELINE IN OML 98

The Nigerian National Petroleum Company Limited (NNPC E& P) want to execute a project On the Sectional Replacement on Selected Portion of Ogharefe – Amukpe Export Pipeline in OML 98;
Read more
COMPLETED

CONSTRUCTION AND EXTENSION OF INLET MANIFOLD IN OPUAMA FIELD, OML 40

The Nigerian National Petroleum Company Limited (NNPC E& P) intends to carry out CONSTRUCTION AND EXTENSION OF THE INLET MANIFOLD IN OPUAMA FIELD OML 40 The scope of work for the project is to carryout Engineering, procurement, fabrication, construction and installation of the Inlet Manifold Skid at Opuama Flowstation OML 40.
Read more
COMPLETED

RAPELE LACT UNIT ACCESS ROAD SECTIONAL ASPHALTING

SEPLAT WEST LIMITED intends to execute a project on the Rapele LACT Unit Access Road Sectional Asphalting the scope includes the following;
Read more
COMPLETED

REPLACEMENT OF EXISTING ABURA FLOWLINES WITH 4” SCHEDULE 80 FLOWLINES IN OML 65

Edemx Energy International Limited executed the Replacement of Existing Abura 8S & L Flowlines With 4” Schedule 80 Flowlines in OML 65. OML 65 is an onshore block in the western axis of Niger Delta, containing one producing field: Abura. Abura has being in production since 1978. The scope of work includes:
Read more
COMPLETED

CONSTRUCTION OF OKPORHURU-OBEN 6″ X 8.7KM SCH 160 NAG BULKLINE

SEPLAT WEST LIMITED intends to execute a project on the CONSTRUCTION OF 8.7km 6” Sch 160 OKPORHURU-OBEN GAS BULKLINE (SECTION A & B) the scope includes the following;
Read more
COMPLETED

OBEN CONDENSATE EVACUATION SYSTEM DEBOTTLE NECKING

SEPLAT WEST LIMITED intends to execute a project on the Modifications, Construction, and Installation of Oben Condensate Evacuation System Debottlenecking. The scope includes the following:
Read more

Company

  • Service
  • Projects
  • Fleets
  • Policies
  • Careers

Follow us

  • Instagram
  • Facebook
  • LinkedIn
  • Twitter

Lagos Office

Phone: +2349115926268
Email: info@edemxenergy.com

Warri Office

Phone: +2349031938225
Email: info@edemxenergy.com

Corporate office - Lagos

14a Hon. E. Adedeji Street, Marwa, Lekki Phase 1, Lagos State

Operation Base - Warri

No. 21, High Court Road, Effurun GRA, Warri, Delta – State.

Fabrication Yard & Marine Base - Warri

Km 3, NPA Expressway, Warri, Delta State